Logo

Established in 1990

Our services

"A high-level vibratory sand screen at BMI Group’s Wigan facility was successfully replaced in just three days—without structural alterations or cranes—delivering a safe, efficient solution that significantly reduced cost and downtime."

View Case Study
Digger on BMI project

"A bespoke modular mezzanine platform was designed, fabricated, and installed within a confined plant room in Selby, enabling the seamless integration of solar control equipment without structural alterations or disruption."

View Case Study
Metal work for Low Carbon Energy

"We're incredibly pleased with GRC Engineering's support on this project. Their bespoke lifting solution was safe, efficient, and allowed us to avoid production downtime."

View Case Study
Frank Roberts project

Get in touch.

Contact us using the details below, or fill out our enquiry form and a member of our team will be in touch as soon as possible.