Uncategorized

5 Meter High Platform

GRC engineering site department with an installation of a high level platform. The design, manufacture and install of the 5-meter-high platform was for a very good client of ours – Shick Esteve. The French company also complimented our engineers on how they completed the installation with the very little room they had to work within.

Uncategorized

Lifting Beam Installation

Bakery lifting beam GRC Engineering were asked to design, manufacture and install a lifting beam and its supporting steelwork onto the roof of an industrial bakery in London. The beam allowed the installation of a new AHU system and also the future maintenance of it too.

Uncategorized

Site Installation

A high level AHU refurbishment GRC Engineering were asked to design, manufacture and install an inlet duct and louvre  for a high level AHU at Royal Blackburn Hospital. The job went without a hitch, luckily our engineers have a good head for heights!

Uncategorized

Fabrications

A selection of recently completed works at our factory in Burnley. Pin oven manufacture and assembly for the aluminium can industry  – Water cooled moulds for the oil and gas industry – Machine sub frame for the oil and gas industry – Pin oven internal framework manufacture for the aluminium can industry – Pipe reinforcing…